Showing posts with label Maunsells. Show all posts
Showing posts with label Maunsells. Show all posts

Thursday, 14 August 2008

Considerate Constructors - Inconsiderate Car Drivers

I'm very disappointed that NCC has decided to close the Lumsden Lane alley onto the Market Place - after I lobbied so hard to keep it open.

The issue is 'conflict' between pedestrians and vehicles creating safety hazards. Yes - Maunsells' works vehicles and M&S delivery lorries have to be there, but the understanding arrived at through Dick Phillips at NCC was that the contractors and M&S would have staff to direct pedestrians during deliveries and he (Dick) would keep a watching brief.

That lasted nearly two weeks - but (and Dick has promised me photos - watch this space) apparently, car users and other lorries were still coming down to the hammerhead junction, parking recklessly and endangering pedestrians. And - reportedly, pedestrians did not seem alert to dangers from vehicles either. In fact - it was (to quote Dick) 'dangerous chaos'.

So - the access has been closed to both vehicles and pedestrians, so that access from Back Riggs onto Bridge Street and the Market Place is now very restricted. Boulevard's pizzeria, the Jewellers' Guild and the Wednesday Market are all suffering.

Friday, 18 July 2008

Considerate Constructors

The early signs are that the contractors (Maunsell), the County Highways Team, Dransfields, the Borough Council - most people involved in the Town Centre redevelopment are prepared to be flexible and try to minimise disruption.
A first indication of this spirit occurred yesterday: Maunsell have built their compound in Lumsden Lane car park and according to the plans, have left a hammerhead turning point for lorries and kept Lumsden Lane itself, leading into the Market Place, open for pedestrians.
Then on Friday, M&S suddenly realised that their delivery lorries might block the pedestrian route and create health & safety problems. On Monday, Maunsell reviewed possibly safety problems to pedestrians with their deliveries to the compound. The immediate maximum safety solution was to exclude pedestrians altogether by closing off Lumsden Lane - and the request to do so went into Highways.
And here's where the thoughtfulness and flexibility comes in - Highways delayed implementation a couple of days to sound out other views.
So - yesterday, I, together with the owners of Boulevards and Jewellers Guild (who depend on Lumsden Lane for passing trade) persuaded Highways (thanks!) to investigate a less drastic option: keeping the Lane open but monitoring problems. I hope M&S will work with us on this.
I also hope that lorry drivers and pedestrians are sensible and alert to the dangers - I don't want this new-found flexibility to lead to injury or worse!
Contact phone numbers for Maunsells and for Highways have been issued against any problems arising.